Chapter 9
As Required Maintenance
RBC/PLT Aperture Plate
CELL-DYN® 3000 System Operator's Manual
9140240E — May 1995
Search
Book TOC
The RBC/PLT aperture plate is automatically cleaned during the
Auto-Clean procedure. However, occasionally it may be necessary to
remove the aperture plate for cleaning. Refer to the instrument logbook
to find the latest baseline count time. Use the baseline count time to
determine the frequency of cleaning needed.
NOTE: The count time is displayed on the
right of the MPV result. The count time is also displayed on the
RAW DATA SUMMARY Screen
DIAGNOSTICS
The RBC/PLT aperture should be cleaned if the count time differs from
the baseline value by more than 0.4 seconds or if there are frequent RBC
CLOG messages. The RBC/PLT aperture plate is located in the RBC/
PLT transducer assembly.
The transducer assembly is depicted in Figure 9.13.
Figure 9.13:
Transducer Assembly — Levers Closed
Go Back
accessible from the
MENU.
Maintenance
As Required
RUN Screen
to the
von Behrens
RBC Transducer
Lever Closed
9-35