4. When the process is complete turn OFF the power to Analyzer,
Data Station, and Sample Loader (if CELL-DYN 3000SL).
5. Carefully remove the reagent inlet tubes from the normally closed
valves under the reagent reservoirs located on the left side panel of
the Analyzer. (If necessary, refer to
these normally closed valves.)
6. Move the peristaltic pump tubing from under the sample aspiration
pump and the WBC transfer pump.
To return to operational status after the period of inactivity, do the
following:
1. Replace reagent inlet tubing into the normally closed valves under
the reagent reservoirs located on the left side panel of the Analyzer.
(If necessary, refer to
closed valves.)
2. Replace peristaltic pump tubing into the sample aspiration pump
and the WBC transfer pump.
3. Replace reagent lines into the appropriate reagent cubitainers.
4. Power ON the Analyzer and then the Data Station.
5. When Initialized, press [RUN] to prime.
6. Verify that the background counts are acceptable by running 5
background counts before running controls. If the controls are
unacceptable, refer to
If the instrument is to be shipped, perform the following steps:
1. Obtain the shear valve dummy center piece from the disk storage
container.
2. Clean the shear valve as directed in
given in the
Weekly Maintenance
Reassemble it using the dummy center piece.
3. Wrap the ceramic center piece carefully for protection and place it
in the accessory kit.
4. Disconnect the power cords and put them in the accessory kit.
Go Back
Figure 1.6
Figure 1.6
for the location of these normally
Chapter 10,
Troubleshooting.
steps 3–12
section of this chapter.
Maintenance
for the location of
in the procedure
9-45

Advertisement

Table of Contents
loading

Table of Contents