Ricoh G035 Service Manual page 383

Table of Contents

Advertisement

[C]
[C]
[F]
15. Secure the bridge unit [A] (4 screws – M4 x 8).
16. Route the cables [B] through the openings [C].
17. Route the solenoid harness [D] through the opening [C].
18. Connect the cables to the solenoid and sensors and clamp the cable as shown.
19. Reinstall the rear cover and proof tray unit.
20. Install the mailbox on the main machine (refer to the Mailbox Installation
procedure for more detail).
If the 3000 sheet finisher (A697) is going to be installed, perform steps 21
to 25.
21. Install the front joint bracket [E] and rear joint bracket [F] which are contained in
the finisher's accessory box.
SM
[B]
[A]
[B]
G912I509.WMF
G912I510.WMF
[E]
12-19
BRIDGE UNIT FOR MAILBOX (G912)
[D]
[B]
[C]
G912I513.WMF
G035

Advertisement

Table of Contents
loading

Table of Contents