Installation Procedure - Ricoh G035 Service Manual

Table of Contents

Advertisement

3.9.2 INSTALLATION PROCEDURE

[A]
G912I506.WMF

CAUTION
Unplug the main machine power cord before starting the following
procedure.
NOTE: The bridge unit for the mailbox must be installed when the 3000 sheet
finisher (A697) will be installed.
1. Unpack the bridge unit and remove the shipping retainers [A].
NOTE: Do not remove the protective sheet [B] at this time.
2. Remove the mailbox if it has been installed.
3. Remove the rear cover [C] of the mailbox (8 screws).
4. Remove the proof tray unit [D] (6 screws, 1 connector).
5. Remove the cover [E].
SM
BRIDGE UNIT FOR MAILBOX INSTALLATION (G912)
[B]
3-35
[A]
[D]
G909I508.WMF
[E]
[C]
G035

Advertisement

Table of Contents
loading

Table of Contents