Daikin DCM601A51 Technical Data Manual page 119

Air conditioners intelligent touch manager
Hide thumbs Also See for DCM601A51:
Table of Contents

Advertisement

ED721208
2.2.3 Installation
(Installation Place)
• Install the unit indoors where it is not exposed to water and dust or dirt.
• Install the unit where both temperature and humidity do not become high.
(Operating (available) temperature: -10 ~ +40˚C)
(Operating (available) humidity: 10 ~ 85%)
• Connect the wiring to be connected in the field from the lower surface side.
It is, therefore, necessary to make arrangements so as not to attach other equipment
within 80mm from the lower surface of this equipment.
• Install this equipment in a place in which only the authorized personnel can touch it.
(Installation Direction)
• Install this equipment vertically to the floor surface. It should be noted that
if it is installed in the horizontal direction, a malfunction or failure may result.
(Installation Method)
• Ensure that this equipment is installed with 4 screws (screw size M4 min.).
2.2 Di Unit <DEC101A51>
UP
(198)
70
70
DEC101A51
Front panel screw
Mounting hole
Unit (mm)
Mounting hole
Adaptor
4
115

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dcm601a52Dcm601a53

Table of Contents