FU-96
FUEL SYSTEM
Power Control System (PCS) (HDB30 (w/ M/T) only)
C.
Inspect VSV operation
(a) Check that air flows from pipes E to the filter.
(b) Apply battery voltage across the terminals.
(c) Check that air flows from pipe E to F.
If operation is not as specified, replace the VSV.
2.
INSPECT SHIFT POSITION SWITCH
(a) Check that there is no continuity between terminals
when the switch is pushed (shift position 1st or
reverse).
(b) Check that there is continuity between terminals when
switch is free (shift position others).
If continuity is not as specified, replace the switch.