Install Face Cam Plate; Install Governor Link; Install Pump Plunger - Toyota 1PZ Repair Manual

Table of Contents

Advertisement

FU-56
FUEL SYSTEM - Injection Pump
12. (1 HZ and 1HD-T)
INSTALL COUPLING

13. INSTALL FACE CAM PLATE

(a) Face the drive shaft with the key groove facing
upward.
(b) Install the coupling spring and camplate with the
camplate pin facing the governor cover side.

14. INSTALL GOVERNOR LINK

(a) Using SST, install the governor link with two new
gaskets and the two support bolts.
Torque: 140 kg-cm (10 ft-lb, 14 N-m)
SST 09260-54012 (09269-54040)
(b) Check that the governor link moves smoothly.

15. INSTALL PUMP PLUNGER

(a) (1PZ)
Place the previously used plunger adjusting shim on
center of the camplate.
(1 HZ and 1HD-T)
Place the previously used plunger adjusting shim on
the center of the camplate.
NOTICE: Do not apply grease to the shim.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1hz1hd-t

Table of Contents