Installation Of Timing Belt; Instal No 1 Camshaft Timing Pulley; Install Cylinder Head Cover; Install Intake Pipe - Toyota 1PZ Repair Manual

Table of Contents

Advertisement

EM-38
ENGINE MECHANICAL - Timing Belt

INSTALLATION OF TIMING BELT

(See page EM-32)
1.
INSTALL NO.1 CAMSHAFT TIMING PULLEY
(a)
Install the set key to the key groove of the cam-
shaft.
(b)
Align the pulley set key with the key groove of the
No.1 camshaft timing pulley, slide the No.1 cam-
shaft timing pulley.
(c)
Temporarily install the No.1 timing pulley bolt.
(d)
Hold the hexagonal wrench head portion of the cam-
shaft with a wrench, and tighten the No.1 camshaft
timing bolt.
Torque:
2.

INSTALL CYLINDER HEAD COVER

(a) Remove any old packing (FIPG) material.
(b)
Apply seal packing to the cylinder head as shown in
the illustration.
Seal packing: Part No.08826-00080 or equivalent
(c)
Install the gasket to the cylinder head cover.
(d)
Install the cylinder head cover with the twelve bolts
(1PZ) or fourteen bolts (1 HZ and 1HD-T) and two
nuts.
3.

INSTALL INTAKE PIPE

(1PZand1HZ)
(a)
(1HZ (Eourope))
Place the intake pipe insulator on the cylinder head
cover.
(b) Install a new gasket and intake pipe with the four
bolts.
(c) Connect the PCV hose.
(1HD-T)
(a)
Install a new gasket and intake pipe with the three
bolts.
(b) Connect the air hose and tighten the hose clamp.
(c)
Connect the turbo vacuum hose.
1,000 kg-cm (72 ft-lb, 98 Nm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

1hz1hd-t

Table of Contents