EM-40
ENGINE MECHANICAL - Timing Belt
(a) Remove any oil or water on each pulley, and keep
them clean.
(b) Install the timing belt in following order:
(1) No.2 camshaft timing pulley
(2) No.1 camshaft timing pulley
(3) Timing belt idler pulley
(c) Using SST, install the tension spring.
SST 09718-20010
(d) Install and torque the spring bolt of the timing belt
idler.
Torque: 270 kg-cm (20 ft-lb, 26 Nm)
8.
CHECK VALVE TIMING
Turn the crankshaft pulley clockwise and check that each
pulley align with the timing marks (TDC mark) as shown in
the illustration.
If the marks do not align, remove the timing belt and
reinstall it.