Chapter 4 - Creating An Equipment Layout Plan And A Card Slot Assignment Plan; Equipment Layout Plan; General Layout Guidelines - Meridian Nortel 1 Option 11C Mini Installation Manual

Planning and installation guide
Hide thumbs Also See for Nortel Meridian 1 Option 11C Mini:
Table of Contents

Advertisement

Chapter 4 — Creating an equipment
layout plan and a card slot assignment
plan

Equipment layout plan

General layout guidelines

Take some time to plan the installation of the Option 11C Mini. This
preparation helps to make sure that the system performs correctly. Develop a
layout plan for the equipment to determine where you will position each
system component.
Give consideration to the lengths of the different cables, so that you make the
best use of available space. Refer to Table 5 on page 37 of this guide for a
description of Option 11C Mini cable and wire specifications.
Preparation of the site according to the plan is very important. Make sure that
the site is ready to accept the equipment. Make sure that items, such as power
outlets and backboards, are installed correctly.
Make sure that the mounting surface can support at least 100 lb
(45 kg).
The following are the installation options for the Option 11C Mini chassis:
wall installation
CAUTION
Option 11C Mini
Planning and Installation Guide
Page 69 of 332

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents