Check Points Before Commissioning; Hydraulic Connections; Electrical Connection - DeDietrich AWHP-2 MIT-IN-2 iSystem Installation And Service Manual

Hide thumbs Also See for AWHP-2 MIT-IN-2 iSystem:
Table of Contents

Advertisement

AWHP-2 MIT-IN-2 iSystem
0
2
4
6
8
10
12
14
CURRENT PROG.C
"Choice of the timeprogram
E
1
applied C"
2
1
D
2
bar
#
F
!

% $
AUTO
J
I
STD
0
2
4
6
8
E
1
2
1
D
2
bar
F
#

% $
AUTO
J
I
STD
5.2

Check points before commissioning

25/06/2014 - 7616371-001-04
16
18
20
22
24
P4
9
<
C002222-C-04
10
12
14
16
18
20
22
24
2x
LUNDI 11:45
!
:
<
C002224-D-04
5. To modify the parameter, turn the rotary button.
6. To confirm, press the rotary button.
To cancel, press key h .
7. To go back to the main display, press key j 2 times.
It is possible to use the ( and
button.
5.2.1.

Hydraulic connections

4 Hoses correctly connected to the heat pump.
4 Fill the installation with water and check hydraulic tightness.
4 Vent the installation with the on/off cycles. Be sure to open all
valves on the heating circuit and the thermostatic valves on the
radiators.
4 After venting, check that the filters are not clogged. Clean the
filters.
4 Raise the pressure to 1.5 / 2 bar.
5.2.2.

Electrical connection

Check the electrical connections, particularly the earth:
4 HP: Mains supply connected
4 Indoor module: Mains supply connected.
4 depending on the version: Connecting the electrical back-up.
4 HP modules interconnected by BUS cable.
5. Commissioning
keys instead of the rotary
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mit-in-2/eMit-in-2/h

Table of Contents