Check Points Before Commissioning; Hydraulic Connections; Electrical Connection - DeDietrich AWHP 6 MR Installation And Service Manual

Air / water heat pump
Hide thumbs Also See for AWHP 6 MR:
Table of Contents

Advertisement

AWHP MIT-IN iSystem
0
2
4
6
8
10
12
14
CURRENT PROG.C
"Choice of the timeprogram
E
1
applied C"
2
1
D
2
bar
#
F
!

% $
AUTO
J
I
STD
0
2
4
6
8
E
1
2
1
D
2
bar
F
#

% $
AUTO
J
I
STD
5.2

Check points before commissioning

24/09/2012 - 300027606-001-01
16
18
20
22
24
P4
9
<
C002222-C-04
10
12
14
16
18
20
22
24
2x
LUNDI 11:45
!
:
<
C002224-D-04
5. To modify the parameter, turn the rotary button.
6. To confirm, press the rotary button.
To cancel, press key h .
7. To go back to the main display, press key j 2 times.
It is possible to use the ( and ' keys instead of the rotary
button.
5.2.1.

Hydraulic connections

4 Hoses correctly connected to the heat pump.
4 Fill the installation with water and check hydraulic tightness.
4 Vent the installation with the on/off cycles. Be sure to open all
valves on the heating circuit and the thermostatic valves on the
radiators.
4 After venting, check that the filters are not clogged. Clean the
filters.
4 Raise the pressure to 1.5 / 2 bar.
5.2.2.

Electrical connection

Check the electrical connections, particularly the earth:
4 HP: Mains supply connected
4 MIT-IN/E and MIT-IN/H: Mains supply connected.
4 MIT-IN/E: Connecting the electrical back-up.
4 HP connected by BUS cable to the terminal block on the inside
module.
5. Commissioning
76