AWHP-2 MIT-IN-2 iSystem
230Vac 50Hz
230Vac/400Vac 50Hz
1
Ele1
Ele2 THERM
25/06/2014 - 7616371-001-04
n Adjustment
2
A
Z
E
R
3
4
Electricity meter (to meter the electrical energy consumed
by the outside module).
Electricity meter (to meter the electrical energy consumed
by the inside module (without electric back-ups)).
Output sensor - PT100.
Return sensor - PT100.
The second electricity meter is not compulsory but can be
used to tally the energy absorbed by the inside module
(PCBs, circulating pumps, 3-way valves, etc.).
The thermal energy is calculated thanks to the two sensors
connected to the PCB and the flowmeter in the inside
module.
¼Refer to the instructions delivered with the option
(HK29).
4. Installation
M003006-B
65