Final Inspection; Final Test; Final Administration - Tait TM9100 Service Manual

Hide thumbs Also See for TM9100:
Table of Contents

Advertisement

8.
9.
Make a final inspection of the exterior to check that no mechanical parts
Task 3 —

Final Inspection

were damaged during the repair. Repeat the inspection given in
Inspection" on page
Test the radio to confirm that it is fully functional again. The recommended
Task 4 —

Final Test

tests are listed in
used for many of these tests.) It is good practice to record the test results on
a separate test sheet. A copy of the test sheet can be supplied to the Customer
as confirmation of the repair.
The final administration tasks are the standard workshop procedures for
Task 5 —
Final
updating the fault database and returning the repaired radio to the Customer
Administration
with confirmation of the repair.
If the radio could not be repaired for one of the following reasons:
Level-1 service centers should return the faulty radio to the nearest ASC,
and level-2 service centers should return the radio to the ISC. Supply details
of the Customer, the fault and, if applicable, the attempted repair.
TM9100 Service Manual
© Tait Electronics Limited August 2005
On receiving the licence file, run the programming application on the
test PC. On the menu bar click Tools > Optional Features.
The Software Feature Enabler dialog appears.
Use the licence file to enable the appropriate software features.
The procedure is given in the on-line help facility under the heading
Enabling a feature. Go to
139. Rectify any damage.
Table 6.2
to
fault not located
repair of fault failed
required repair is level-3 repair
Task
3.
Table
6.4. (The calibration application can be
Servicing Procedures
"Visual
149

Advertisement

Table of Contents
loading

Table of Contents