Cable Routing And Electrical Parts Installation Instructions "Te - Txc; Coil Position Te -Txc; Turning Indicators Flasher (Te) And Solenoid Starter Position - Husqvarna TC 250 2010 Workshop Manual

Hide thumbs Also See for TC 250 2010:
Table of Contents

Advertisement

ELECTRICAL SYSTEM
CABLE ROUTING AND ELECTRICAL PARTS INSTALLATION INSTRUC-
TIONS "TE - TXC"

• Coil position TE -TXC

Connect the HT coil as shown in the figure.
• Relay (1) and fuses (2) position (TE - TXC)
On right side of motorcycle.
• Turning indicators flasher (3) (TE) and solenoid starter position
(TE
- TXC)
On left side of motorcycle.
M.44
Part. N. 8000 H1489 (10-2009)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc 250 2009Txc 250 2010

Table of Contents