Cable Routing And Electrical Parts Installation Instructions; Coil Position And Connector Connection; Position Of Utilities - Husqvarna 2011 TE 630 Workshop Manual

Te 630 / 2011 i.e. sms 630 / 2011 i.e.
Table of Contents

Advertisement

A
1
B
C
H006018
ELECTRICAL SYSTEM

Cable routing and electrical parts installation instructions

• Coil position and connector connection

Connect the HT coil (1) as shown in the figure
Secure the main wiring harness ground to screw (A).
Secure the engine ground to screw (B)
Connect connector (C) to the main wiring harness.

• Position of utilities

Secured to utilities holder plate under the saddle.
1 ) Solenoid starter
2 ) Rollover sensor
3 ) Relay (Injector, Lambda Sensor, Fuel Pump, Coil)
4 ) Electric fan relay
5 ) Horn, turning indicators, stop lights, low and high beam lights relay.
6 ) Turning indicator flasher
7 ) Fuse 23, FP- 15A (cable sheath marked "P"): fuel pump, HT coil, lambda
sensor heater, injector;
8 ) Fuse 23A, FM- 15A (cable sheath marked "M"): 12V depending on ignition
switch (system voltage), parking lights;
9 ) Fuse 23B, FDC- 20A (cable sheath marked "DC"): electric fan, rear stop light,
high beam, low beam, turning indicators, horn, instrument panel power supply
(instrument functions display).
M.44
Part. N. 8000 H2051 (02-2010)

Advertisement

Table of Contents
loading

Table of Contents