Installing The Slot Cover; Concluding Steps; Replacing The Dynamiclom Module; Preliminary Steps - Fujitsu PRIMERGY RX2540 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2540 M1:
Table of Contents

Advertisement

Expansion cards and backup units
9.8.3.3

Installing the slot cover

Figure 167: Installing the slot cover
Ê Insert the slot cover. Remark the marking!
9.8.3.4

Concluding steps

"Reassembling" on page 61
Ê
"Connecting the server to the power source" on page 66
Ê
"Switching on the server" on page 67
Ê
"Enabling SVOM boot watchdog functionality" on page 86
Ê
9.8.4

Replacing the DynamicLoM module

Upgrade and Repair Unit
(URU)
Tool:
– Phillips PH0 / (+) No. 0 screw driver
– hexagon screw driver 5 mm
9.8.4.1

Preliminary steps

"Disabling SVOM boot watchdog functionality" on page 70
Ê
262
Upgrade and Maintenance Manual
Hardware: 10 minutes
RX2540 M1

Advertisement

Table of Contents
loading

Table of Contents