Concluding Steps; Software Configuration - Fujitsu PRIMERGY RX2520 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2520 M1:
Table of Contents

Advertisement

Figure 231: Installing the UFM
Ê Connect the UFM to the system board, snapping in the UFM spacer.

14.3.1.3 Concluding steps

"Reassembling" on page 59
Ê
"Connecting the server to the power source" on page 64
Ê
"Switching on the server" on page 66
Ê
"Enabling SVOM boot watchdog functionality" on page 87
Ê
"Enabling BitLocker functionality" on page 93
Ê

14.3.1.4 Software configuration

The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
RX2520 M1
Upgrade and Maintenance Manual
System board and components
339

Advertisement

Table of Contents
loading

Table of Contents