Concluding Steps - Fujitsu PRIMERGY RX2520 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2520 M1:
Table of Contents

Advertisement

Figure 65: Reconnecting the cables to the pass-through/expander board
Ê Reconnect the SAS cables to the 3.5-inch HDD SAS / SATA backplane:
– Cable C24 from connector MLC1 on the RAID controller to connector X1
front on the pass-through/expander board (1).
– Cable C24 from connector MLC2 on the RAID controller to connector X1
rear on the pass-through/expander board (2).
I
For a complete cabling overview, please refer to section
cables" on page
7.4.3.6

Concluding steps

"Installing the fan box" on page 171
Ê
"Reassembling" on page 59
Ê
Ê Reinstall all HDD / SSD modules to their original drive bays as described in
section
"Installing 3.5-inch HDD modules" on page
"Connecting the server to the power source" on page 64
Ê
"Switching on the server" on page 66
Ê
"Enabling BitLocker functionality" on page 93
Ê
RX2520 M1
393.
Upgrade and Maintenance Manual
Hard disk drives / solid state drives
136.
"List of used
157

Advertisement

Table of Contents
loading

Table of Contents