System Fan; Basic Information - Fujitsu PRIMERGY RX2520 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2520 M1:
Table of Contents

Advertisement

8

System fan

Safety notes
V
CAUTION!
Do not damage or modify internal cables or devices. Doing so may
cause a device failure, fire, or electric shock.
Devices and components inside the server remain hot after
shutdown. After shutting down the server, wait for hot components to
cool down before installing or removing internal options.
Circuit boards and soldered parts of internal options are exposed and
can be damaged by static electricity. Always discharge static build-up
(e.g. by touching a grounded object) before handling electrostatic-
sensitive devices (ESDs).
Do not touch the circuitry on boards or soldered parts. Hold circuit
boards by their metallic areas or edges.
If devices are installed or disassembled using methods other than
those outlined in this chapter, the warranty will be invalidated.
For further information, please refer to chapter
information" on page 37
8.1

Basic information

The following fans are available:
– five system fans included in a system fan box (12x 3.5-inch version)
– two or three (redandant option) system fans included in a system fan box
(1CPU, 2.5-inch. variant and 8x 3.5-inch variant )
– three or four (redandant option) system fans included in a system fan box
(2CPU, 2.5-inch. variant and 8x 3.5-inch variant )
– up to two fans, that are integral parts of the power supply units and cannot
be replaced separately
I
The fan redundancy is optional availabe for all configurations, except for
the 12x 3.5-inch version. This system version is always assembled with
5 fans, without any redundancy
RX2520 M1
Upgrade and Maintenance Manual
"Important
163

Advertisement

Table of Contents
loading

Table of Contents