Concluding Steps; Replacing Memory Modules; Preliminary Steps - Fujitsu PRIMERGY RX2520 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2520 M1:
Table of Contents

Advertisement

Main memory
Figure 120: Removing memory modules (B)
Ê Remove the ejected memory module.

10.3.3 Concluding steps

"Reassembling" on page 59
Ê
"Connecting the server to the power source" on page 64
Ê
"Updating or recovering the system board BIOS and iRMC" on page 75
Ê
"Switching on the server" on page 66
Ê
"Enabling SVOM boot watchdog functionality" on page 87
Ê
"Enabling BitLocker functionality" on page 93
Ê
10.4

Replacing memory modules

Upgrade and Repair Unit
(URU)
Tools: tool-less

10.4.1 Preliminary steps

"Locating the defective server" on page 49
Ê
Ê Identify the defective memory slot using the server management software.
"Disabling or suspending BitLocker functionality" on page 67
Ê
"Disabling SVOM boot watchdog functionality" on page 68
Ê
228
Upgrade and Maintenance Manual
Hardware: 5 minutes
Software: 5 minutes
RX2520 M1

Advertisement

Table of Contents
loading

Table of Contents