Reassembly And Remounting - Suzuki Katana 1100 Service Manual

Table of Contents

Advertisement

FUEl AND LUBRICATION SYSTEM
4-10
REASSEMBLY AND REMOUNTING
Reassemble and remount the carburetor assembly in the
reverse order of disassembly and removal.
Pay attention to the following points:
• Place the tongue
CD
of diaphragm to carburetor body
properly.
• When engaging two carburetors or two pairs of carburetors,
position the throttle valve control lever
®
correctly.
• Apply thread lock cement to the upper and lower plates'
screws.
99000-32040: Thread lock cement
• Align the starter shaft securing screw
CD
with dent mark
®
­
on the starter shaft and grease sliding portions.
-
• Set each throttle valve in such a way that its top end
@
meets
the foremost by-pass
@.
This is accomplished by turning the
throttle stop screw and throttle valve balance screws.
• After all work is completed, mount the carburetors on the
engine and the following adjustments are necessary.
*
Engine idle r/min
Page 2-9
*
Throttle cable play
Page 2-9
*
Balancing carburetors
Page 4-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsx 11oof

Table of Contents