4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
7) Connect the solenoid harness to CN1 on the RSV PC board and CN11 on the Main PC board.
Pass the solenoid harness through the cut.
8) Connect the solenoid cable to CN2 on the RSV PC board.
Main PC Board
CN11
Solenoid Harness
9) After attaching the solenoid, reassemble the operation panel ass'y and the side panel (L) in the
reverse order of removal.
NOTE: Perform "<9> FOR FACTORY" of system mode to make sure the solenoid performs
properly.
4.4 RIBBON SAVING MODULE (B-9904-R-QM)
Cut
4-19
EO18-33012A
RSV PC Board
CN2
Solenoid Cable
CN1