TEC SX4T - B B/W Direct Thermal User Manual page 175

B-sx4t/sx5t series
Table of Contents

Advertisement

4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT
5)
Insert folded tag paper (1.5-mm thick) between the print head and the platen, and then turn the
head lever to Lock position. Insert the head up arm into the plunger of the solenoid. While
holding down the head up arm slightly, lift the solenoid. Secure the solenoid to the frame with the
two SM-4x8 screws keeping the solenoid in contact with the spacer.
Head Up Arm
6)
Attach the cable clamp to the frame of the printer. Fix the solenoid cable with this cable clamp.
Cable Clamp
NOTE: Be careful not to snag the solenoid harness when running it.
Plunger
Spacer
Solenoid
Solenoid Harness
4.4 RIBBON SAVING MODULE (B-9904-R-QM)
Frame
Solenoid
4-18
EO18-33012A
SM-4x8 Screw
Solenoid Cable

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sx5t series

Table of Contents