Installing The Cable Box, Frames R1 - ABB ACS580 Series Hardware Manual

General purpose drives
Hide thumbs Also See for ACS580 Series:
Table of Contents

Advertisement

IP66
(UL Type 4X)
a
b
Weight
4. Position the drive onto the lower bolts (4a) on the wall to support the weight
of the drive. Rotate drive to the wall and place drive over the upper bolts (4b).
WARNING!
R1...R2, IP21: Do not lift the drive by holding it from the cover. The drive
can fall and become damaged or damage the surroundings.
5. Tighten the bolts in the wall securely.
4a
Installing the cable box, frames R1...R2
6. Remove the screw (6a) and lift the cover off (6b) from the separate cable box.
R1
mm
in
175
6.89
497
19.57
kg
lb
11.8
26
Mechanical installation 87
R2
mm
in
175
6.89
581
22.87
kg
lb
14.5
32
4b
5
R3
mm
in
244
9.61
622
24.49
kg
lb
26.4
58
×4