30 Introduction to the manual

Quick installation and commissioning flowchart

Task
Identify the frame of your drive: R1...R9.
Plan the installation: select the cables, etc.
Examine the ambient conditions, ratings and
required cooling air flow.
Unpack and examine the drive.
Make sure that all necessary optional mod-
ules and equipment are present and correct.
If the drive will be connected to another sys-
tem than symmetrically grounded TN-S sys-
tem: Examine if you must disconnect the EMC
filter or ground-to-phase varistor.
Install the drive on a wall.
Route the cables.
Measure the insulation of the input cable and
the motor and the motor cable.
Connect the power cables.
See
Type designation key (page 54)
Guidelines for planning the electrical install-
ation (page 95)
Technical data (page 265)
Mechanical installation (page 59)
IEC:
Grounding system compatibility
check (page 132)
North America:
Grounding system compatib-
ility check (page 176)
Mechanical installation (page 59)
Routing the cables (page 114)
IEC:
Measuring the insulation (page 130)
North America:
Measuring the insula-
tion (page 174)
IEC:
Connecting the power cables (page 139)
North America:
Connecting the power
cables (page 184)