Unpacking And Examining Delivery, Frame R7 - ABB ACS580 Series Hardware Manual

General purpose drives
Hide thumbs Also See for ACS580 Series:
Table of Contents

Advertisement

Unpacking and examining delivery, frame R7

8
6
1
7
1
Drive with factory installed options
2
Cable box (not with option +B056, +C135 or +P944).
Note: The cable box is mounted to the IP55 drive module frame at the factory.
3
Packing brackets, 2 pcs
4
In the option tray:
• Europe: Quick installation and start-up guide kit (6 languages)
• North America: Quick installation and start-up guide
• Multilingual residual voltage warning stickers
5
Cardboard box
6
Fixing screws, 2 pcs
7
Pallet
8
VCI bag for protecting against corrosion
9
Straps
9
5
4
2
3
Mechanical installation 79

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs580-01 seriesAcs580-01-293a-4+j400

Table of Contents