SONET test procedures
Span/Ring testing exit checklist
....................................................................................................................................................................................................................................
Checklist
....................................................................................................................................................................................................................................
8 - 4 6
Verify that all procedures described below has been completed. If a
procedure was not applicable, indicate "N/A".
Procedure
Fiber connection
DCC provisioning
Remote login test
Line timing
provisioning
Line timing test
Point to point / Ring
test
Lucent Technologies
Result
Initials Notes
(Passed, Failed,
N/A)
Span / Ring testing
365-374-074
Issue a, April 2002