Point To Point / Ring Testing - Lucent Technologies LambdaUnite MSS Installation Manual

Multiservice switch
Table of Contents

Advertisement

SONET test procedures

Point to point / Ring testing

....................................................................................................................................................................................................................................
Overview
Before you begin
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
This test provides procedures for testing the 2-fiber BLSR
functionality and verifies the end-to-end transmission through the ring.
Prior to performing this task, you must:
verify that all required circuit packs are installed (see Chapter 5,
section
"Circuit pack installation"
verify that no cross-connections have been made on any port to
be included in the protection group
verify that the DCC channels are configured correctly (see
section
"Provision DCC"
Lucent Technologies
(5-8))
(8-29)).
Span / Ring testing
8 - 3 9

Advertisement

Table of Contents
loading

Table of Contents