NE provisioning and stand alone installation
test entry checklist

Entry checklist

....................................................................................................................................................................................................................................
Procedure
Have all procedures been completed which are
required in Chapter 5,
installation exit checklist"
Is the CD-ROM (CC109088708) available
which contains WaveStar® CIT and the NE
software?
Is a laptop or desktop PC available meeting the
minimum requirements (see section
CIT requirements"
(2-6))?
Is a crossed LAN cable CAT5 with 4-wire
RJ-45/RJ-45 connectors available?
Is the following test equipment available?
Optical power meter with LC connectors
Multimeter
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
The following provides a checklist to be completed prior to perform
the WaveStar
installation tests. Verify that each procedure has been completed.
Check off and initial the item.
"Physical and power
(5-19))?
"WaveStar
Lucent Technologies
WaveStar
®
CIT installation, NE provisioning and stand alone
Completed
®
CIT installation and NE provisioning
Initials
Notes