Entry Checklist - Lucent Technologies LambdaUnite MSS Installation Manual

Multiservice switch
Table of Contents

Advertisement

Span/Ring testing entry checklist

Entry checklist

....................................................................................................................................................................................................................................
Procedure
Have all procedures been completed which are
required in Chapter 7,
stand alone installation test exit checklist"
(7-18))?
Is a laptop or desktop PC available meeting the
minimum requirements (see section
®
WaveStar
CIT requirements"
Is a crossed LAN cable CAT5 with 4-wire
RJ-45/RJ-45 connectors available?
Is the following test equipment available?
Optical power meter with LC connectors
Multimeter
....................................................................................................................................................................................................................................
8 - 4
The following provides a checklist to be completed prior to perform
the span/ring testing. Verify that each procedure has been completed.
Check off and initial the item.
"NE provisioning and
"
(2-6))?
Lucent Technologies
Completed
Initials
Span / Ring testing
Notes
365-374-074
Issue a, April 2002