Safety Requirements In Specific Deployment Phases; Overview - Lucent Technologies LambdaUnite MSS Installation Manual

Multiservice switch
Table of Contents

Advertisement

Safety requirements in specific deployment phases

Overview

....................................................................................................................................................................................................................................
Purpose
Deployment phases
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
To enable rapid orientation, safety instructions are given on the
following pages, which are assigned to various stages in the life cycle
of the LambdaUnite
The instructions are arranged according to the following deployment
phases:
"Transportation" (1-22)
"Storage" (1-25)
"Installation" (1-27)
"Taking into operation" (1-30)
"Operation and maintenance" (1-32)
"Taking out of operation" (1-38)
Lucent Technologies
MSS equipment ("deployment phases").
Safety
1 - 2 1

Advertisement

Table of Contents
loading

Table of Contents