Technical Data For Subrack - Lucent Technologies LambdaUnite MSS Installation Manual

Multiservice switch
Table of Contents

Advertisement

NEBS-2000 installation

Technical data for subrack

....................................................................................................................................................................................................................................
Specifications
Item
Voltage range
(all components)
Power feeds
Power consumption,
Circuit breakers
Weight
Dimensions (D x W x H)
Site Engineering Dimensions
Subrack requirements
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
Quantity/Value
-48 to -60 V battery voltage
(-40.5 V minimum, -72 V maximum)
2 power feeders (A, B)
Release 1.0 and 2.0:
max. 2700 W
68 A circuit breakers must be used in the External
Battery and Fuse Bay (BDFB)
63 A circuit breakers are part of the subracks.
Release 2.1:
max. 3500 W
Circuit breakers ≥ 100 A must be used in the
External Battery and Fuse Bay (BDFB)
100 A circuit breakers are part of the subracks.
Maximum 41kg [90.41 lbs]
(includes: user panel, fan, PIs, CI-CTL TIs and 12x
blanks at the rear).
545mm [21.457"] x 500mm [19.685"] x 950mm
[37.402"]
(includes fan and cabling).
545mm [21.457"] x 500mm [19.685"] x 1100mm
[43.307"]
(includes cabling and fan space)
The mounting requirements are:
Leave a space of ≥ 100 mm [3.94"] above the subrack, when a
single subrack is mounted into a rack frame.
The subrack is designed for mounting in the LambdaUnite
rack frames in such a way the temperature can be controlled and
the cables laid properly.
Lucent Technologies
Mechanical installation
MSS
3 - 4 3