SDH test procedures
Line timing provisioning
....................................................................................................................................................................................................................................
Overview
Before you begin
Procedure
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
This section provides a procedure which must be carried out before
performing the line timing test (see section
Be If necessary existing timing references must be deleted before
Prior performing this task,
•
you must have at least a privilege code of P3
•
the DCC channels must be configured correctly (see section
"Provision DCC"
•
the correct synchronisation system mode (SDH) must be selected
(see Chapter 6, section
•
existing timing references must be deleted.
Proceed as follows to configure the line timing reference:
............................................................................................................................................................
Login to the NE-A as described in Chapter 6, section
1
procedure"
(6-12).
............................................................................................................................................................
Configuration → Timing/Sync
Select
2
®
WaveStar
CIT.
Result:
The window
............................................................................................................................................................
Select the tab
3
Line Reference 1
•
Select
PRC
box.
•
Select the priority
Reference Priority
•
Select the port AID in the drop-down-list box
AID
. Click on
Line Timing Port AID
Lucent Technologies
(8-10))
"System parameters"
Synchronisation Characteristics
and set the following parameters:
in the
Provisioned Quality Level
in the drop-down list box
1
.
Browse...
in order to open the window
.
Span / Ring testing
"Line timing test"
(6-16)).
"NE login
in the
of the
System View
appears.
drop-down list
System Timing
Assigned Port
Select
(8-17)).
8 - 1 5