NE provisioning and stand alone installation test exit checklist
....................................................................................................................................................................................................................................
Checklist
....................................................................................................................................................................................................................................
7 - 1 8
Verify that all procedures described below has been completed. If a
procedure was not applicable, indicate "N/A".
Procedure
WaveStar® CIT
installation
NE login
NE name (TID)
provisioning
Provisioning of the
system parameters
Provisioning of the
timing references
Provisioning of the
system timing
LED test
Alarm reporting test
NE synchronisation test
Optical power meter
test
Port and cross-connect
test
Lucent Technologies
Result
Initials Notes
(Passed, Failed,
N/A)
Stand alone test procedures
365-374-074
Issue a, April 2002