Line Timing Provisioning - Lucent Technologies LambdaUnite MSS Installation Manual

Multiservice switch
Table of Contents

Advertisement

SONET test procedures

Line timing provisioning

....................................................................................................................................................................................................................................
Overview
Before you begin
Procedure
....................................................................................................................................................................................................................................
8 - 3 4
This section provides a procedure which must be carried out before
performing the line timing test (see section
Prior performing this task,
you must have at least a privilege code of P3
the DCC channels must be configured correctly (see section
"Provision DCC"
the correct synchronisation system mode (SONET) must be
selected (see Chapter 6, section
existing timing references must be deleted.
Proceed as follows to configure the line timing reference:
............................................................................................................................................................
Login to the NE-A as described in Chapter 6, section
1
procedure"
(6-12).
............................................................................................................................................................
Configuration → Timing/Sync
Select
2
®
WaveStar
CIT.
Result:
The window
............................................................................................................................................................
Select the tab
3
Line Reference 1
Select
PRS
box.
Select the priority
Reference Priority
Select the port AID in the drop-down-list box
AID
. Click on
Line Timing Port AID
Lucent Technologies
(8-29))
"System parameters"
Synchronisation Characteristics
and set the following parameters:
in the
Provisioned Quality Level
in the drop-down list box
1
.
Browse...
in order to open the window
.
Span / Ring testing
"Line timing test"
(6-16)).
"NE login
in the
of the
System View
appears.
drop-down list
System Timing
Assigned Port
Select
Issue a, April 2002
(8-36)).
365-374-074

Advertisement

Table of Contents
loading

Table of Contents