Linkage And Grommet - Mercury 25 EFI Service Manual

Hide thumbs Also See for 25 EFI:
Table of Contents

Advertisement

6.
Wrap the forward cable in the outer groove around the top side of the pulley.
7.
Rotate the tiller handle to the neutral position.
8.
Place the reverse cable jacket into the upper slot of the anchor bracket.
9.
Place the forward cable jacket into the lower slot of the anchor bracket.
10. Adjust the shift/throttle cables. Refer to Throttle Cable/Linkage Adjustments preceding.

Linkage and Grommet

1.
Install the throttle rod to the throttle opener.
90-8M0105568 eng MARCH 2016
b
a
e
d
© 2016 Mercury Marine
a -
b -
a
18145
b
f
c
Tiller Handle
Forward cable
Forward cable slot
a -
Reverse cable
b -
Upper slot in anchor
bracket
c -
Lower slot in anchor
bracket
d -
Forward cable
e -
Reverse cable end
f -
Forward cable end
18158
Page 7B-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

30 efi25 efi jet

Table of Contents