Srx210 Services Gateway Rack Requirements; Site Preparation Checklist For The Srx210 Services Gateway; General Site Guidelines For Installing The Srx210 Services Gateway - Juniper SRX210 Series Manual

Services gateway
Hide thumbs Also See for SRX210 Series:
Table of Contents

Advertisement

SRX210 Services Gateway Hardware
Related
Documentation

SRX210 Services Gateway Rack Requirements

40
Table 17: SRX210 Services Gateway Cabinet Requirements (continued)
Cabinet
Requirements
Specifications
Clearance
The cabinet is at least 1 U (1.75 in. or 4.5 cm) high.
requirements
The outer edges of the mounting brackets extend the width of either chassis
to 19 in. (48.2 cm), and the front of the chassis extends approximately 0.5
in. (1.27 cm) beyond the mounting brackets.
The minimum total clearance inside the cabinet is 30.7 in. (78 cm) between
the inside of the front door and the inside of the rear door.
NOTE:
cm) apart, measured from the center of the hole.
Cabinet airflow
Ensure sufficient ventilation through the cabinet is sufficient to prevent
requirements
overheating.
Ensure adequate cool air supply to dissipate the thermal output of the
device.
Install the device as close as possible to the front of the cabinet so that
the cable management system clears the inside of the front door. Installing
the chassis close to the front of the cabinet maximizes the clearance in
the rear of the cabinet for critical airflow.
Route and dress all cables to minimize the blockage of airflow to and from
the chassis.
NOTE:
and reduces the chance of overheating.
General Site Guidelines for Installing the SRX210 Services Gateway on page 39
Site Preparation Checklist for the SRX210 Services Gateway on page 37
SRX210 Services Gateway Rack Requirements on page 40
Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services
Gateway on page 41
The services gateway can be installed in a rack. Many types of racks are acceptable,
including front-mount racks and four-post (telco) racks.
NOTE:
The services gateway cannot be center mounted in a rack.
Table 18 on page 41
provides the details of requirements for rack size, clearance, airflow,
spacing of mounting brackets and flange holes, and connecting to the building structure.
The holes for the mounting brackets chassis are spaced 1.25 in. (3.2
A cabinet larger than the minimum required provides better airflow
Copyright © 2012, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents