Avaya IG550 Installing And Configuring page 90

Integrated gateway
Table of Contents

Advertisement

Installing an IG550 Integrated Gateway with the CLI
c. Install the mounting brackets onto the chassis, as needed. Avaya recommends that you
use the center-mount chassis holes in the center of the chassis sides to mount the
brackets.
Figure 28: Attaching the brackets to the chassis
d. Lift the chassis, with its mounting brackets attached, into position on the rack. Use the
resting hole to temporarily hold the chassis.
3. Place the top screws and bottom screws in the mounting bracket into the rack. Tighten all
screws.
4. Remove the bolts or screws in the resting holes.
90 Installing and Configuring the IG550 Integrated Gateway
J u
n i
N E
T W
p e
A LM
O R
G at
A C
ew
K S
T
ay
r
T G
M 55
0
A LM
A na
A C
lo g
T IM
T
51
C on
R S
4
T
A S
so
B
le
A LM
E 1/
A C
T 1
1
E T
T IM
T
T S
R
T
51
0
S IG
2
Li ne
1
Tr un
3
k
2
POWER
4
STATUS
3
Li ne
S O
5
4
ALARM
E I
HA
6
S M
Li ne
P O
E M
W
7
E R
S I
A LM
R E
8
E O
B R
C O
S E
A C
I
N F
T
T
IG
T IM
52
TX/
1
RX
0/ 0
LIN
K
TX/
RX
0/ 1
10
LIN
/1 00
K
TX/
/1 00
RX
0
0/ 2
LIN
TX/
K
RX
1
0/ 3
LIN
K
C O
N S
O LE
A U
X
0
1
U S
B
qsmabrkt LAO 102406
2
3
4
1
2
3
4
5
6
J 4 3
5 0

Advertisement

Table of Contents
loading

Table of Contents