Avaya IG550 Installing And Configuring page 61

Integrated gateway
Table of Contents

Advertisement

Figure 25: DC power connections to the 2350 chassis
3. Use a Phillips screwdriver to remove the clear plastic cover that protects the terminal block.
4. Within the terminal block, remove the two center screws that are next to the labels -48 VDC
and RTN.
5. Each screw contains a captive washer that you use to secure a DC source power cable lug
to the terminal block.
6. Use one of the removed screws to secure the positive (+) DC source power cable lug to the
RTN terminal.
7. Use the other removed screw to secure the negative (-) DC source power cable lug to the
-48 VDC terminal.
8. Dress the power cables appropriately.
9. Replace the clear plastic cover over the terminal block.
10. Verify that the power cables do not block access to router components or hang where
people might trip on the cables.
Issue 2 January 2008
61

Advertisement

Table of Contents
loading

Table of Contents