Perform these tasks before you begin the installation:
''Unpack and Inspect Media Gateway'' on page 65
''Unpack and Inspect Stratum 3 Clock Cabinet'' on page 129
Perform these tasks to install the media gateways:
''Install Earthquake Protection for Media Gateway'' on page
!
WARNING:
If the approved ground or approved floor ground can only be accessed inside a dedicated
power equipment room, then connections to this ground should be made by a licensed
electrician. See
Approved
''Connect AC Power and Ground'' on page 71
page 81
''Connect Remote Power Off Cable'' on page 90
''Connect External Alarm Cable'' on page 93
Interconnect cabling between port networks
- Direct connect to rack hardware
- Direct connect to each port network (duplex and high/critical)
- Switch-connect to port networks (duplex and high/critical)
Check the customer's order and the shipping packing lists to confirm all equipment is
1
present.
2
Check the S8700 Multi-Connect configuration adjuncts for damage and report all
damage according to local shipping instructions.
3
If any equipment is missing, report the information to your Avaya representative.

Unpack and Inspect Media Gateway

!
CAUTION:
A media gateway may weigh as much as 800 lb. (363 kg) and may be top heavy. Use
extreme caution.
Grounds.
for more information.
or
''Connect DC Power and Ground'' on
October 2002
Installing an Avaya MCC1 Media Gateway
and
''Install Auxiliary Cabinet
68, if required
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcc1Scc1

Table of Contents