Avaya S8700 Installing Manual page 184

With media gateways
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

184
Patch Cord/Jumper Installation and Administration
11
If installing another distribution field terminal block, partially install the first screw for
the terminal block, on the line, 7/8-in. (2.2 cm) to the right of the previous screw.
Partially install the second mounting screw 7-11/16 in. (19.5 cm) to right of the screw
just installed. Repeat Steps 4, 5, and 6.
If installing a vertical patch cord trough in the distribution field, repeat Step 6.
12
13
Repeat Steps 11 and 12 until all the terminal blocks and vertical patch cord troughs in the
distribution field are installed.
110A-Type Terminal Blocks (300-Pair)
Figure notes
1
2
3
4
5
4 ft (1.22 m)
6.6 ft (2 m)
7.68 in. (19.5 cm)
7/8-in. (2.22 cm)
5.31 in. (13.5 cm)
6
47.5 in. (120.6 cm)
Horizontal Line
7
8
AC Power Strip
9
Floor Line
October 2002
r758420b MMR 031496

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcc1Scc1

Table of Contents