70
Installing an Avaya MCC1 Media Gateway
9
When all 4 threaded rods are cut, replace the raised floor panels removed in Step 5.
10
Position the media gateway over the holes and adjust the leveling legs until the media
gateway is level.
NOTE:
If the S8700 Multi-Connect configuration is supplied with cable ductwork, the media
gateways must be level from front to rear and from side to side. They must be square with
respect to each other to within +-1/8-in. (0.3 cm).
11
Insert the threaded rods through the media gateway bottom and thread into the concrete
floor anchors.
12
Place a 3/8-in. flat washer onto each rod. Thread a 3/8-16 hex nut onto each rod and
tighten securely.
13
Repeat this procedure for each media gateway to be installed (including the auxiliary
cabinet, if required).
Earthquake Mounting — Raised Computer Floor
4 inches
(10.16 cm)
raised
variable
floor
height
concrete
subfloor
October 2002
3/8 inch
flat washer
Nut welded
to frame
Leveling
foot
3/8 - 16
threaded rod
3/8 - 16
Concrete floor
anchor
cab_base CJL 052096