Upgrading Core 0 - Avaya Meridian 1 Series Upgrade Manual

Communication server cs 1000m sg cp piv to cs 1000m mg cp piv fnf upgrade
Table of Contents

Advertisement

Page 69 of 159
Performing the upgrade

Upgrading Core 0

Adding Side 0 FIJI hardware
NN43021-466
Standard 06.02
Procedure 15
Checking that Core 1 is active
To upgrade Core 0, verify that Core 1 is the active side performing
call processing:
1
Verify that Core 1 is active:
LD 135
STAT CPU
Procedure 16
Checking that Clock Controller 1 is active
1
Check the status of the Clock Controllers:
LD 60
SSCK 1
Procedure 17
Install Side 0 FIJI cards
1
Unpack the FIJI cards (NTRB33).
2
Faceplate-disable the NTRB33 cards.
1
Insert and seat the FIJI cards in all Side 0 shelves.
Note: Double slot FIJI cards install in slots 2 and 3 of the Network
modules, and slots 8 and 9 of the Core/Net modules. Single slot FIJI cards
(with vintages equal to or later than NTRB33BBE5) install in slot 2 of the
Network modules, and slot 9 of the Core/Net modules.
December 2013
Load program
Obtain the status of the CPUs
End of Procedure
Load program
Obtain the status of Clock Controller 1
End of Procedure
End of Procedure

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000m seriesCs 1000m sgCs 1000m mg

Table of Contents