Avaya Meridian 1 Series Upgrade Manual page 68

Communication server cs 1000m sg cp piv to cs 1000m mg cp piv fnf upgrade
Table of Contents

Advertisement

5
Stat network cards:
LD 32
STAT x
****
6
Print status of all controllers:
LD 97
REQ
TYPE
****
7
Make internal, external and network calls.
8
Check attendant console activity.
9
Check DID trunks.
10 Start up and check all applications.
During INI, FIJI error messages (from Shelf 0) appear on the screen. FIJI card
on shelf 1 resets. Upon INI completion, RING 1 is full, FIJI Ring 0 (in Core/Net
0) is disabled, AUTO recovery is on and Clock Controller 1 is active.
Performing the customer's test plan
Ensure that all network resources in Core/Net shelf 1 are now functional.
Performing the upgrade
x = loop number
Exit program
PRT
XPE (returns status of all controller cards)
Exit program
End of Procedure
Core 1 is now active with ring 1 drives full. Clock
Controller 1 is active. Call processing should be active on
Core/Net 1.
CS 1000M SG CP PIV to CS 1000M MG CP PIV FNF Upgrade
Page 68 of 159

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000m seriesCs 1000m sgCs 1000m mg

Table of Contents