Connecting LAN 1
Procedure 12
Connecting LAN 1
1
Attach the LAN 1 cable to the CP PIV faceplate connector on Core 1.
Switching call processing to Core/Net 1
Procedure 13
Switching call processing
1
Hardware enable all CNI cards in Core 1.
2
Enter LD 135 on Core/Net 0 and issue the CUTOVR command. Call
processing switches to Core/Net 1 and service is interrupted.
LD 135
CUTOVR
****
3
After Core/Net 1 initializes. log in to Core/Net 1 and verify that the cutover
was successful.
Performing the upgrade
CAUTION — Service Interruption
Service Interruption
The following procedures interrupt call processing. All
active calls are lost.
LAN 1 and LAN 2 cables are now connected.
End of Procedure
Transfer call processing from active Core/Net to
standby Core/Net
Exit program
CS 1000M SG CP PIV to CS 1000M MG CP PIV FNF Upgrade
Page 66 of 159