Postconversion checks

Table 16

Postconversion checks

Post Conversion Checks
Perform these checks after a successful INI.
Test for dial tone
Stat D Channels for proper operation
Ensure that all XPEC's are in service via visual inspection
Ensure that all AUX applications are working
LD 30 LDIS (Verify that output is the same prior to upgrade)
Appendix A: Upgrade checklists
CS 1000M SG CP PIV to CS 1000M MG CP PIV FNF Upgrade