Performing the upgrade
Example of upgrading a redundant system from CS 1000
Release 5.5 software to Release 6.0 software
Command
Active side (CPU 0): SPLIT
Inactive Side (CPU1):
1) upgrade to 6.0 S/W
2) reboot -1
Active side (CPU 0):
Upgrading Core 1
NN43021-466
Standard 06.02
State = Active/ Redundant
HSP IP = 127.2.0.2
S/W = 5.5
State = Active/ Redundant
HSP IP = 127.2.0.2
S/W = 5.5
No change
State = Inactive / Split
Procedure 4
Checking that Core 0 is active
To upgrade Core 1, verify that Core 0 is the active side performing
call processing:
1
Verify that Core 0 is active.
LD 135
STAT CPU
December 2013
CPU 0
Load program
Obtain the status of the CPUs
CPU 1
State = Inactive /
Redundant
HSP IP = 127.2.0.1
S/W = 6.0
Cold Start to become split
State = Inactive / Split
HSP IP = 127.2.0.1
(w negotiation) S/W = 6.0
Cold Start
State = Inactive / Split
HSP IP = 127.2.0.1
(w negotiation) S/W = 6.0
Warm Start to become
Active