Server Card Hardware Installation - Avaya Meridian 1 Series Upgrade Manual

Communication server cs 1000m sg cp piv to cs 1000m mg cp piv fnf upgrade
Table of Contents

Advertisement

Page 111 of 159
Table 6
Readiness checklist (Part 2 of 2)
Have you:
Checked for correct grounding facilities?
Obtained the following
• screwdrivers
• an ECOS 1023 POW-R-MATE or similar type of multimeter
• appropriate cable terminating tools
• a computer (maintenance terminal) to connect directly to the Signaling Server, with
— teletype terminal (ANSI-W emulation, serial port, 9600 bps)
— a Web browser for Element Manager (configure cache settings to check for new
Web pages every time the browser is invoked, and to empty the cache when the
browser is closed)
Prepared the network data as suggested in Converging the Data Network with VoIP
(NN43001-260) or Communication Server 1000M and Meridian 1 Large System
Planning and Engineering (NN43021-220), as appropriate for your Communication
Server 1000 system?
Read all safety instructions in Communication Server 1000M and Meridian 1 Large
System Installation and Commissioning (NN43021-310), as appropriate for your
Communication Server 1000 system?

Server card hardware installation

NN43021-466
Standard 06.02
lnstalling a Signaling Server
This section contains instructions for installing a Server in a Communication
Server 1000M system. The Communication Server 1000M system supports
the NTDW66 CP PM card, NTDW54 CP DC card, and Comercial
off-the-shelf (COTS) servers.
This section contains only general instructions to install the Server card in
Communication Server 1000M systems. For more detailed installation
December 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000m seriesCs 1000m sgCs 1000m mg

Table of Contents