boards.fm
Boards for HiPath 3000
Peripheral boards
Options for supplying power to the base stations
For information on connecting the base stations, refer to the HiPath Cordless Office
>
service manual.
Each base station must be connected to the SLC16N via the main distribution frame (MDFU or
MDFU-E).
Always route the U
P0/E
to lightning. To do so, insert the polarized surge protectors (supplied) in the plugging locations
on the splitting strip from above.
The following options are available for supplying power to the base stations:
Power supply via one U
●
Power supply via two U
●
Power supply via three U
●
If the power supplied by the UPSC-D (HiPath 3550) is insufficient, additional power can be sup-
plied by installing the external power supply (Powerbox PB3000 with LUNA2 (Page 3-149).
Signal propagation times differ due to the varying distances between the base stations, the sys-
tem, and the connection cables used (refer to the HiPath Cordless Office service manual). The
SLC16N board automatically balances these propagation times.
3-146
interfaces on the SLC16N via a splitting strip to arrest surges caused
interface (Page 3-147)
P0/E
interfaces (Page 3-148)
P0/E
interfaces (Page 3-149), for BS3/3 only
P0/E
Nur für den internen Gebrauch
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation